Report No. CECDP – 2015/01 Clearbrook Interchange Improvement Project, Abbotsford, BC. - Volume III - Drawings
Brown, Logan (author) DeVos, Jacob (author) Dodgshon, Keith (author) Ferraby, Jeff (author) Hackett, Matt (author) CIVL 7090 CIVL 7090 CECDP-2015/01 (editor) (translator)
Copyright held by authors. All rights reserved. No part of this work covered by the copyright heron may be reproduced or used in any form or by any means – graphics, electronic, or mechanical including photocopying, taping, or information storage and retrieval systems – without written permission of the author.
The project described in the attached design report consists of the design for two new roundabouts, an overpass, the geotechnical analysis of the site, the drainage plan, and the construction sequencing plans. We, the undersigned, declare that the work presented in this draft submission is entirely original, and has been done by us, independently as well as together, so each of us has a complete understanding of the calculations and results presented.