Report No. CECDP – 2015/02 Design of Hat Lake Forestry Service Road Report - Title Page
Milne, Angus (author) Kim, Jay (author) Ip, Monica (author) Arena, Nick (author) CIVL 7090 (editor) (translator)
Copyright held by authors. All rights reserved. No part of this work covered by the copyright heron may be reproduced or used in any form or by any means – graphics, electronic, or mechanical including photocopying, taping, or information storage and retrieval systems – without written permission of the author.
Title Page. Clear Cut Consulting (CCC) Ltd. design report, drawings and appendices for the design of the Hat Lake Forestry Service Road located at Fort St. James, BC. The following design report includes: + hydrologic analysis of stream crossing Site 7a and Site 10, + survey data processing of Hat Lake Road, + road alignment and forest road crossing design, + alternative alignment evaluation, + superstructure design at Site 10, + substructure analysis and design at Site 10, + environmental and erosion analysis, + sustainability considerations, + construction scheduling and cost.