Master of Science in Ecological Restoration Applied Research Projects
This is Canada’s first master’s program specializing in Ecological Restoration and is offered as a joint program between British Columbia Institute of Technology (BCIT) and Simon Fraser University (SFU). The MSc in Ecological Restoration combines the strong technical and applied (experiential) knowledge at BCIT with SFU’s fundamental (contextual) basic science and community engagement expertise.
Pages
-
- A Test of ARP Topic Categories
- This is the abstract text for a test record. ThiThis is the abstract text for a test record. s is the abstract text for a test record. This is the abstract text for a test record. This is the abstract text for a test record. This is the abstract text for a test record. This is the abstract text for a test record. This is the abstract text for a test record. This is the abstract text for a test record., Water reclimation, soil
-
- A climate adaptation plan: Identifying thermal refugia for salmonids in the Tsolum River
- Stream temperatures in the Pacific Northwest are increasing due to climate change, resulting in thermal stress for salmonids. Groundwater is a cooler source of water into streams, providing thermal refugia. The goal of this Applied Research Project was to identify groundwater input areas in the Tsolum River, using temperature loggers to trace the thermal signal of groundwater. A total of 28 water temperature loggers and 2 air temperature loggers were deployed within the watershed in the summer of 2019. Results showed that 12 sites may be influenced by groundwater input. Restoration/management actions such as riparian planting, gravel bar live staking, and restrictions on groundwater withdrawal are recommended to decrease stream temperatures. This study demonstrated that temperature loggers can be deployed within streams to identify areas of groundwater input. The identification of thermal refugia within the Tsolum River and other salmonid-bearing streams will help to protect salmonids from climate change impacts., climate adaptation, thermal refugia, Tsolum River, groundwater
-
- A contrast of two novel deterrents of goose herbivory at Westham Island foreshore tidal marsh
- Since the 1980s, at least 160 ha of marsh vegetation has died off in Sturgeon Bank and Westham Island, located within the Fraser River Estuary. Proposed causes for this marsh recession include sediment deficit, relative sea-level rise, increased salinity, and goose herbivory. At Westham Island, the loss of tidal marsh vegetation is locally distinct in that it occurs in a closed polygon shape versus along the leading edge of the marsh, suggesting that goose herbivory is a principal cause. Goose herbivory on tidal marsh vegetation has become a global problem as many geese populations are becoming hyperabundant. In the Fraser River Estuary, Canada goose (Branta canadensis) and snow goose (Anser caerulescens) numbers have been increasing exponentially. I conducted a field experiment, testing two novel goose herbivory deterrents at Westham Island’s foreshore tidal marsh: metal and snow fencing placed flat against the substrate. I used a randomized complete block design with six replicates and three treatments: metal fencing, snow fencing and control (no fencing). Each treatment's effectiveness was assessed by monitoring changes in common three-square bulrush (Schoenoplectus pungens) every two weeks throughout the summer season (June-September 2022) in terms of stem density, percent cover, and percent of stems grazed. Results indicated that there was no difference in stem density, percent cover, and percent of stems grazed between the two fencing types. However, compared to bulrush in the controls, both snow and metal fencing treatments yielded a higher stem density and percent cover (x̄% difference = 82.9%, 53.1%, respectively) as well as a lower percent of stems grazed. These results suggest that both fencing materials are equally effective at deterring goose herbivory in a tidal marsh. Additional assessments are needed to clarify whether this technique can be scaled up to promote marsh recovery throughout the entire area of recession., tidal marsh recession, goose herbivory deterrents, goose management, Canada geese, common three-square bulrush, snow fencing, chain-link fencing
-
- A historical marsh vegetation composition comparison between five Fraser River foreshore marshes
- A full composition study of some key Fraser River foreshore marshes, Boundary Bay, Brunswick Point, Westham Island, Lulu Island, and Sea Island, had not been done in several decades, during which a large-scale marsh recession event occurred at two of the marshes. The vegetation composition is measured in this study with relation to soil water, soil pore water salinity, and elevation. The results in this study show a shift in the vegetation composition in some areas of the Lulu Island marsh, with the other marshes remaining relatively similar to historical data. The plant species’ tolerance to soil water, soil salinity, and elevation vary in each marsh, illustrating the need for individualized restoration plans for each marsh. Conserving and restoring these marshes is critical in light of the many changes in the Fraser River delta, including sea level rise, increased geese populations, altered sediment regimes, and urbanization., Fraser River, brackish marsh, salt marsh, vegetation composition, salinity, elevation
-
- A meta-analysis of North Shore streams: maximizing the effect of installed rain gardens through strategic placement
- A meta-analysis using pre-existing data was done for streams in the North Shore of Vancouver, British Columbia. Parameters considered were chemical concentrations from stormwater input including: heavy metals concentrations (Copper (Cu), Zinc (Zn), Cadmium (Cd), Lead (Pb)) and nutrient concentrations (Nitrate (N03-) and Orthophosphate (P04 3-))_ Chronic toxicity guideline exceedance based on the British Columbia Approved Water Quality Guidelines was found in all 94% of stream systems for Cu and 44% of stream systems for Zn. Heavy metal concentrations were found to be positively correlated with percent impervious surface cover in the watershed, with the strength of the correlation being metal-dependent. Three sites within the study had the highest levels of both Cu and Zn. These watersheds (Upper Keith Creek, Maplewood Creek, and Mackay Creek) were prioritized for rain garden installation. Rain garden building specifications to remediate for Zn and Cu were recommended and included addition of mulch layer, minimum depth of topsoil (30 cm), and vegetating with plants with high potential for biofiltration and/or phytoremediation., Impervious surface cover, Stormwater, Rain garden, Green infrastructure, Heavy metal analysis
-
- A mitigation plan for salmonid spawning habitat in the Lower Seymour River, North Vancouver
- Salmonids are a very important species to British Columbia and the Pacific Northwest. They are an icon of British Columbia’s heritage and they hold many ecological, economical, recreational, and cultural values. Unfortunately, Pacific salmonid populations have been declining over the last century due many reasons including degradation of freshwater habitat used for spawning and rearing. This degradation is largely due to expanding urbanization and the installation of dams for flood control, hydropower and water supply. The Seymour River is a mountainous river located in North Vancouver. Over the past century, this river has been subjected to many anthropogenic activities that have cumulatively altered the natural flow and sediment regime. The Seymour Falls Dam, located in the middle of the watershed, intercepts gravel transport from the upper watershed into the lower reaches. This combined with the intense channelization within the lower 4 km of the river, which has created conditions incapable of gravel deposition and retention, has led the lower reaches to become gravel deficient. This gravel deficiency has caused the degradation of traditional spawning grounds of chum (Oncorhynchus keta), and pink salmon (Oncorhynchus gorbuscha). This study aims to: 1) determine if there is a gravel deficiency for chum and pink salmon spawning in the lower 1.5 km reaches and, 2) provide recommended mitigative treatments of gravel addition to increase suitable spawning area, and therefore increase salmon productivity of the Seymour River. A site assessment was conducted on the lower 1.5 km of the Seymour River and included sampling of the five key parameters that define spawning habitat (i.e., water depth, velocity, dissolved oxygen, water temperature and substrate). A particular focus was given on analysing the substrate as it was expected to be deficient for spawning due to the predetermined conditions in the watershed such as the dam and the channelization. Results of the site assessment confirmed that substrate is the limiting factor for chum and pink salmon spawning in this area as the bed surface is composed of large cobbles and boulders too large for these specific species to move to dig a redd. Therefore, a xi mitigation plan of gravel addition is proposed to increase spawning habitat and conserve these salmon runs. Two gravel placement sites were selected between Mt. Seymour Parkway and Dollarton Bridge. A gravel mobility analysis determined that suitable-sized gravel will not be deposited or retained naturally on the channel bed due to the slope and water depth at high flood events. Therefore, gravel catchment structures are proposed to dissipate energy, thereby promoting deposition and reducing scouring. Each site contains a different design tailored to the specific characteristics of that reach. To retain gravel, spurs composed of the surface cobbles and boulders are proposed along with imbedded gravel pads composing of suitably sized gravel brought in from a local source. In total these two sites could provide about 1,925 m2 of additional spawning habitat which could support 209-836 pairs of chum or 3,208 pairs of pink salmon. Through long-term monitoring, this project in the Seymour River could provide strategies of gravel placement in large, urbanized, gravel-deficient rivers, in which current research is limited. Many rivers in North Vancouver (i.e., Capilano River, Lynn Creek, McKay Creek and Mosquito Creek) may be experiencing a gravel deficit similar to the Seymour River, and the strategies outlined in this project could be adapted to the specific conditions of those rivers. The cumulative effect of adding spawning gravel in each river within the Burrard Inlet, as well as elsewhere in the Pacific Northwest, could reduce stress in their freshwater phase and aid in rebuilding salmon populations from their precipitous decline in which they are on currently on track for. The strategies provided will also become important as more rivers become sediment deprived due to the construction of hydropower dams in response to a change from fossil fuels to renewable energies as climate change continues. The need for more innovative habitat mitigation strategies will be necessary to keep salmon from becoming a relic of the past.
-
- A prey-based approach to restoration
- Forestry in British Columbia’s old-growth forests has reduced critical foraging and breeding habitat for the coastal northern goshawk (Accipiter gentilis laingi) and restricted population growth. Now at-risk, efforts to recover this subspecies have focused on establishing suitable habitat and a well-distributed population within the province. However, regional diets and associated dynamics are also critical to goshawk recovery and remain poorly understood. Including a synchronous predator-prey recovery approach to current plans can bridge these knowledge gaps. A new model and methods were developed to translate prey biological requirements into structural surrogate features that could be parameterized and ranked within GIS software. Applying these ranks to known goshawk territories in the South Coast allowed for the visualization and quantification of areas with subpar predicted prey abundances. This provided insight on links between prey and forest structure and can be used to direct future restoration and research decisions for coastal goshawk prey-based recovery.
-
- A restoration strategy to avert the projected ecological, social and economic risks of Lost Lagoon in Stanley Park, British Columbia
- The coastal saltmarsh that once made up Lost Lagoon was isolated into a freshwater impoundment to enable the construction of the Stanley Park Causeway in 1916. Water chemistry, water nutrients, and subsurface sediment were collected in August to October 2017, and it was concluded that Lost Lagoon is experiencing, low DO (average 6 mg/L), high salinity (0.9 ppt), high nutrient loading (TP 0.1 mg/L and TN 0.9 mg/L) and has elevated heavy metals (Cd, Cu, Ni, Pb, and Zn). A general biotic inventory was conducted and results indicated a lack of native species diversity and presence of invasive species, for both flora and fauna. Projected future conditions concluded that Lost Lagoon is prone to stratification and higher temperatures, which is expected to further water impairment including, increases in NH3 and toxic algae blooms. To mitigate this trajectory, a systematic restoration plan was developed to reintroduce tidal flushing into Lost Lagoon from Coal Harbour’s western basin, thereby restoring the degraded ecosystem into a diverse coastal saltmarsh. Hydrogemorphology and flow rates were estimated and as a result a 1.3-m wide water channel was recommended. A planting and long-term monitoring plan that will aid in revitalization of a coastal saltmarsh was developed, alongside a preliminary project budget and schedule. The project feasibility and public response were discussed as constraints, with emphasis on furthering this proposed restoration plan with professional engineering, and First Nations and public consultation., ecological projections, restoration, urban wetland, saltmarsh, intertidal ecosystems
-
- A riparian restoration plan for a construction site on the Brunette River
- Urbanization has altered riparian ecosystems, resulting in the decline of species that depend on them. The Brunette River in the Lower Mainland of British Columbia is no exception; though it currently supports a range of biotas, many of them are at-risk. These impacts are further accentuated by the expansion of the Trans Mountain Pipeline, which will result in the removal of a portion of critical habitat for the endangered Nooksack Dace. In light of the cultural significance of the basin to Kwikwetlem First Nations, the goal of this plan is to improve conditions at the project site post-construction through the establishment of culturally and ecologically important species and the addition of habitat features. I completed soil, vegetation, and water quality surveys to inform my prescriptions. Recommendations include the management of non-native species using manual and mechanical control methods and the planting of a native riparian community that fits within the confines of human infrastructure. A robust monitoring plan is also provided., critical habitat, exotic species, First Nations, restoration, riparian, urbanization
-
- Abiotic and native vegetation species associations of an invasive tree species in the Central Kootenays BC
- I studied an invasive tree species black locust (Robinia pseudoacacia L.), in BC’s Lower Columba Valley (LCV). Black locust has invaded forests and open lands since its introduction to revegetate disturbed slopes in the 1940’s. I conducted research to help my partners Teck Metals Ltd. achieve three goals: (1) assess the ability of aerial imagery to support visual identification of black locust stands and recommend strategies for improving black locust identification, (2) identify abiotic conditions and native vegetation species associated with risks of black locust invasion, and (3) develop strategies to contain new black locust invasions in the LCV and remediate sites invaded by black locust. Aerial imagery successfully helped identify flowering black locust trees but did not help identify non-flowering trees and black locust shrubs and recruits. Black locust cover increased in association with increasing temperature, light availability, moisture availability, and soil disturbance, but black locust did not occur on sites with permanently saturated soils. Black locust was associated with early-seral deciduous tree species including black cottonwood and trembling aspen and the native conifer species western white pine and Douglas-fir. Black locust was not associated with later-seral coniferous species associated with either hot and dry conditions (including ponderosa pine) or cool conditions (including western hemlock). Black locust invasions may be able to be contained and restored by physically remediating disturbed sites, removing black locust on disturbed sites, and planting native tree and shrub species to stabilize soils and reduce black locust seedbank and rootstock establishment and maturation success by outcompeting black locust for light, space, and moisture. Native forests may be able to be re-established on sites invaded by mature black locust stands by protecting sites from further disturbances, restoring native tree species throughout the region to increase propagule availability and re-colonization success, and planting native tree and shrub species to replace maturing black locust stands with native mid- and later-seral forest species., black locust, forest ecology, invasive species, ecosystem succession, image validation, ecological restoration
-
- Alaksen National Wildlife Area: Reservoir suitability for the introduction of the endangered Western Painted Turtle
- Alaksen National Wildlife Area located in Delta, BC is home to freshwater species in the former tidal marsh. The current agricultural landscape has left a legacy of high concentrations of heavy metals, trace amounts of organochlorine pesticides, and excess nutrients within the sediments and water of the brackish Fuller and Ewen Reservoirs. Arsenic and phosphorous exceeded Canadian water quality guidelines, while arsenic, chromium, copper, iron, manganese, nickel, and phosphorus exceeded sediment quality guidelines. There were trace pesticides known to be endocrine disrupters detected in the water and sediment, and combined low level toxicity effects are a concern. A preliminary ecological risk assessment on the metals was completed and the results indicate that there is a possibility of adverse effects for benthic invertebrates, but negligible risk for endangered Western Painted Turtles. However, compounding all the ecosystem stressors along with rising sea levels leads ANWA not an ideal place to introduce this species., © Darian Weber, 2019. All rights reserved. No part of this work covered by the copyright heron may be reproduced or used in any form or by any means – graphics, electronic, or mechanical including photocopying, taping, or information storage and retrieval systems – without written permission of the author., Western Painted turtles, ecotoxicology, risk assessment, agricultural reservoir, heavy metal, endocrine disruptors
-
- An ecological restoration plan for a weedy field at the University of British Columbia Okanagan
- Grassland ecosystems are rare, in decline, and support a multitude of at-risk species in British Columbia. At the University of British Columbia Okanagan in Kelowna BC, a 3.3 ha site at the entrance of the campus is outlined as Okanagan grassland in campus design plans but currently lacks native bunchgrass communities. The goal of this restoration plan is to return grassland plant communities to the site despite the pervasiveness of noxious weeds. I characterised site conditions through soil and vegetation surveys. Restoration recommendations include managing noxious weeds through mowing, hand-pulling and some herbicide application. The site will be replanted with bunchgrass vegetation, two pockets of ponderosa forest, and two types of shrub communities. A walking path, signage, and two xeriscape gardens will also be included to control human use of the landscape. Long-term monitoring will be incorporated into classroom curricula to tie monitoring to learning opportunities., Grassland, exotic plants, Noxious weeds, urban restoration, restoration plan