Master of Science in Ecological Restoration Applied Research Projects | BCIT Institutional Repository

Master of Science in Ecological Restoration Applied Research Projects

Pages

Investigating bull kelp decline in Saturna Island Interim Sanctuary Zone
Kelp is an ecologically, economically, and culturally important species that is facing global declines. This pilot project investigated if declines in Bull Kelp in the Saturna Island Interim Sanctuary Zone could be attributed to increased herbivory by sea urchins, and/or thermal stress caused by increased ocean temperatures. In areas where sea urchins were excluded, bull kelp was more abundant and in areas where sea urchins were not excluded, heavy grazing was observed. Throughout the summer 2023 study period, sea surface temperature did not exceed bull kelp’s adult or gametophyte thermal tolerance. Restoration of this site should include methods to reduce sea urchin herbivory, while carefully considering cultural and ecological implications., macroalgae, sea urchin, bull kelp, kelp restoration, herbivore exclusion
Investigating regeneration in a raised ombrotrophic bog after peat extraction
Burns Bog is a raised ombrotrophic bog in Delta, British Columbia and faced with myriad disturbances. This study is focused on the impact and restoration of peat extraction by the Atkins-Durbrow Hydropeat method. Depth to water table, relative abundance and distribution of vegetation, and the degree of peat decomposition at consistent-depth intervals were investigated to elucidate the status of passive and active ecological restoration in three fields previously harvested for peat approximately one decade apart and compared to a fourth unharvested field. Summary statistics, Redundancy Analysis, and regression were used to compare restoration status and trends in hydrology, vegetation composition, and peat accumulation. A lag period between cessation of harvest and implementation of restoration, coupled with rapid anthropogenic climate change, serve as impediments to restoration here. Intervention in the form of improved rainfall retention, assisted recolonization, and the introduction of nurse species are recommended to improve bog function and resiliency., Atkins-Durbrow Hydropeat method, Ditch blocking, Ecological restoration, Peat extraction, Raised ombrotrophic bog, Burns Bog
Investigating the role of elevated salinity in the recession of a large brackish marsh in the Fraser River estuary
At least 160 ha of the Sturgeon Bank low marsh in the Fraser River delta died off between 1989 and 2011. Humans have heavily modified the Fraser River estuary since the late 1800’s, including installing a series of jetties throughout the leading edge of the delta to train the course of the river. I established a reciprocal transplant experiment to determine the role of elevated salinity in the marsh recession and generate information needed to eventually revegetate areas of receded marsh as part of an intergovernmental collaboration to investigate the causes of this marsh recession. I propose specific actions to better monitor, maintain, and restore the Fraser River delta foreshore brackish marshes in response to ongoing ecological degradation of the estuary. The predicted effects of climate change and sea-level rise may cause us to rethink options for restoring the Sturgeon Bank marsh., Restoration, Fraser River, Schoenoplectus pungens, Reciprocal transplant experiment, Marsh recession, Brackish marsh
A meta-analysis of North Shore streams: maximizing the effect of installed rain gardens through strategic placement
A meta-analysis using pre-existing data was done for streams in the North Shore of Vancouver, British Columbia. Parameters considered were chemical concentrations from stormwater input including: heavy metals concentrations (Copper (Cu), Zinc (Zn), Cadmium (Cd), Lead (Pb)) and nutrient concentrations (Nitrate (N03-) and Orthophosphate (P04 3-))_ Chronic toxicity guideline exceedance based on the British Columbia Approved Water Quality Guidelines was found in all 94% of stream systems for Cu and 44% of stream systems for Zn. Heavy metal concentrations were found to be positively correlated with percent impervious surface cover in the watershed, with the strength of the correlation being metal-dependent. Three sites within the study had the highest levels of both Cu and Zn. These watersheds (Upper Keith Creek, Maplewood Creek, and Mackay Creek) were prioritized for rain garden installation. Rain garden building specifications to remediate for Zn and Cu were recommended and included addition of mulch layer, minimum depth of topsoil (30 cm), and vegetating with plants with high potential for biofiltration and/or phytoremediation., Impervious surface cover, Stormwater, Rain garden, Green infrastructure, Heavy metal analysis
A mitigation plan for salmonid spawning habitat in the Lower Seymour River, North Vancouver
Salmonids are a very important species to British Columbia and the Pacific Northwest. They are an icon of British Columbia’s heritage and they hold many ecological, economical, recreational, and cultural values. Unfortunately, Pacific salmonid populations have been declining over the last century due many reasons including degradation of freshwater habitat used for spawning and rearing. This degradation is largely due to expanding urbanization and the installation of dams for flood control, hydropower and water supply. The Seymour River is a mountainous river located in North Vancouver. Over the past century, this river has been subjected to many anthropogenic activities that have cumulatively altered the natural flow and sediment regime. The Seymour Falls Dam, located in the middle of the watershed, intercepts gravel transport from the upper watershed into the lower reaches. This combined with the intense channelization within the lower 4 km of the river, which has created conditions incapable of gravel deposition and retention, has led the lower reaches to become gravel deficient. This gravel deficiency has caused the degradation of traditional spawning grounds of chum (Oncorhynchus keta), and pink salmon (Oncorhynchus gorbuscha). This study aims to: 1) determine if there is a gravel deficiency for chum and pink salmon spawning in the lower 1.5 km reaches and, 2) provide recommended mitigative treatments of gravel addition to increase suitable spawning area, and therefore increase salmon productivity of the Seymour River. A site assessment was conducted on the lower 1.5 km of the Seymour River and included sampling of the five key parameters that define spawning habitat (i.e., water depth, velocity, dissolved oxygen, water temperature and substrate). A particular focus was given on analysing the substrate as it was expected to be deficient for spawning due to the predetermined conditions in the watershed such as the dam and the channelization. Results of the site assessment confirmed that substrate is the limiting factor for chum and pink salmon spawning in this area as the bed surface is composed of large cobbles and boulders too large for these specific species to move to dig a redd. Therefore, a xi mitigation plan of gravel addition is proposed to increase spawning habitat and conserve these salmon runs. Two gravel placement sites were selected between Mt. Seymour Parkway and Dollarton Bridge. A gravel mobility analysis determined that suitable-sized gravel will not be deposited or retained naturally on the channel bed due to the slope and water depth at high flood events. Therefore, gravel catchment structures are proposed to dissipate energy, thereby promoting deposition and reducing scouring. Each site contains a different design tailored to the specific characteristics of that reach. To retain gravel, spurs composed of the surface cobbles and boulders are proposed along with imbedded gravel pads composing of suitably sized gravel brought in from a local source. In total these two sites could provide about 1,925 m2 of additional spawning habitat which could support 209-836 pairs of chum or 3,208 pairs of pink salmon. Through long-term monitoring, this project in the Seymour River could provide strategies of gravel placement in large, urbanized, gravel-deficient rivers, in which current research is limited. Many rivers in North Vancouver (i.e., Capilano River, Lynn Creek, McKay Creek and Mosquito Creek) may be experiencing a gravel deficit similar to the Seymour River, and the strategies outlined in this project could be adapted to the specific conditions of those rivers. The cumulative effect of adding spawning gravel in each river within the Burrard Inlet, as well as elsewhere in the Pacific Northwest, could reduce stress in their freshwater phase and aid in rebuilding salmon populations from their precipitous decline in which they are on currently on track for. The strategies provided will also become important as more rivers become sediment deprived due to the construction of hydropower dams in response to a change from fossil fuels to renewable energies as climate change continues. The need for more innovative habitat mitigation strategies will be necessary to keep salmon from becoming a relic of the past.
Modelling potential impacts of sea level rise on Siwash Island
Siwash Island is a tidal marsh situated at the southern end of the Widgeon Marsh Regional Park Reserve, Coquitlam, British Columbia (BC). The numerical model MarshMorpho2D was used to depict the evolution of marsh under various scenarios of sea level rise (SLR), suspended sediment concentration (SSC), and tidal range (TR) over the next 80 years. Changes in SLR and TR substantially impact the island’s morphology. Higher TR and SLR cause higher inundation and erosion rate, resulting in loss of vegetation, elevation, and habitat across the island. The model projection indicates that Siwash Island is likely to submerge within the next 80 years. The MarshMorpho2D model provides insights for policymakers and conservationists to develop adaptive strategies to mitigate the effect of SLR on coastal ecosystems., tidal marsh, numerical model, MarshMorpho2D, sea level rise, tidal range, suspended sediment concentration
Nanaimo River estuary restoration: an assessment of berm removal on benthic macroinvertebrates in tidal channels
Macroinvertebrates in two berm-impacted tidal channels (Site A and Site B) were compared to a natural channel (Site C) to determine short-term response to berm removal restoration using a BACI study design. Multivariate analysis indicates that the benthic community composition shifted from before berm removal to after berm removal conditions but not in a predictable organized way. Total abundance was highest at Site A in both conditions (before and after berm-removal). Invertebrate diversity was similar and low among sites. Biomass was highest at Site C. Organic matter percentage was highest at Site C in both conditions and it appeared to increase in Site A and Site B after berm removal. Silt & Clay (>0.0063mm) were statistically different in Site C compared to Site A and Site B although very fine sand was the highest in percentage among sites and in both conditions. Berms affect channel and benthic invertebrate dynamics; time and more research are needed to fully restore the Nanaimo estuary., © Okezioghene Akporuno, 2020. All rights reserved. No part of this work covered by the copyright heron may be reproduced or used in any form or by any means – graphics, electronic, or mechanical including photocopying, taping, or information storage and retrieval systems – without written permission of the author., Estuary restoration, Tidal channel, Benthic macroinvertebrate, Sediment, Detritus, Berm
Novel ecosystems: necessity, revolution, or laziness?
The earth’s environment, climate, and natural systems are constantly changing, having little resemblance of ecosystems past. These new systems functioning in balance are termed “novel ecosystems” and have arisen as the new normal posing an important question in the restoration field as to how these systems should be approached. To address the state of novel ecosystems in the academic literature, I devised a matrix to assess variables of description regarding novel ecosystems and how they are expressed in the literature. Results showed a predominance of self-assembled systems with a disposition towards invasive species as a primary threat. Chemical, physical, and landscape data was severely lacking and most metrics for success were ecological. Data from the literature show a lack of research on designed novel ecosystems but shows promise for success given several examples. More research on novel ecosystems in restoration must be undertaken to fill gaps in aggregate data., © Michael Paleologou, 2020. All rights reserved. No part of this work covered by the copyright heron may be reproduced or used in any form or by any means – graphics, electronic, or mechanical including photocopying, taping, or information storage and retrieval systems – without written permission of the author., Ecological Restoration, Novel Ecosystems, Literature Review
Phytoremediation of contaminated soils
Phytoremediation poses an ecologically friendly and cost-effective alternative to other remediation methods such as chemical or thermal treatment. However, in contaminated sites such as retired oil wells and brine spills, it is common to have a co-contamination of salt and polyaromatic hydrocarbons (PAHs). The co-contamination of salt and PAHs may decrease the rate and effectiveness of bioremediation. Here we investigated the effect soil salinity has on the rate of phytoremediation, plant survivability and biomass. A 90-day greenhouse study was performed, growing alfalfa (Medicago sativa L.) in soils treated with varying salt (NaCl) concentrations in the presence of pyrene and benzo[a]pyrene. No significant differences were observed in the presence or absence of PAHs. Salt treatments has significant affects on plant biomass, nodulation, and successful germination., Bioremediation, Polyaromatic hydrocarbons, Alfalfa, Salt, Phytoremediation
Plant facilitation effects as a potential restoration tool in riparian ecosystems in Southwestern British Columbia
This study began to investigate potential facilitative effects among shrub species in riparian ecosystems in southwestern British Columbia. I ran two concurrent studies. Six plots for each of four treatments were established at the Coquitlam River Wildlife Management Area. The first two treatments compared the survival, growth, flowering, and herbivory rates of planted twinberry seedlings in plots where the shrub layer was removed to plots where it was not. The other two treatments compared the survival, growth, leaf loss, flowering and herbivory rates of snowberry plants in plots where the salmonberry upper shrub layer was removed to those where it was not. No significant differences between the measured parameters in any of the treatments were found. These results are discussed in the context of the riparian forest ecosystem and current facilitation theory. The results are then used to inform an ecological restoration plan for the Suwa’lkh School Forest., Facilitation, Riparian forests, Native vegetation, Symphoricarpos albus, Lonicera involucrate, Rubus spectabilis, Ecological restoration
A prey-based approach to restoration
Forestry in British Columbia’s old-growth forests has reduced critical foraging and breeding habitat for the coastal northern goshawk (Accipiter gentilis laingi) and restricted population growth. Now at-risk, efforts to recover this subspecies have focused on establishing suitable habitat and a well-distributed population within the province. However, regional diets and associated dynamics are also critical to goshawk recovery and remain poorly understood. Including a synchronous predator-prey recovery approach to current plans can bridge these knowledge gaps. A new model and methods were developed to translate prey biological requirements into structural surrogate features that could be parameterized and ranked within GIS software. Applying these ranks to known goshawk territories in the South Coast allowed for the visualization and quantification of areas with subpar predicted prey abundances. This provided insight on links between prey and forest structure and can be used to direct future restoration and research decisions for coastal goshawk prey-based recovery.
Re-establishing the historic fire regime to restore the Chittenden Meadow, Skagit Valley Provincial Park, British Columbia, Canada
Prescribed burning is being used by BC Parks as a restoration tool to maintain the ecologically unique Chittenden Meadow in Skagit Valley Provincial Park. Forest encroachment of conifers in the meadow, due to the absence of fire, has been an ongoing issue since the 1970s. BC Parks in partnership with the BC Wildfire Branch conducted prescribed burns in April 2003 and April 2021 to reduce forest encroachment into the meadow. In 2017, BCIT students re-established a series of plots to compare vegetation community changes with the 2003-2004 prescribed burn data. This data was compared to our 2021 findings. Continued long-term monitoring of the meadow will help to enhance our understanding of vegetation community changes following prescribed fires and will build upon a decade of existing data. The historical extent of the meadow remains unclear; therefore, we conducted a broad fire history study across ~275-ha of forest surrounding the Chittenden Meadow to better understand the area's past fire frequency and severity., prescribed burning, forest encroachment, vegetation community change, fire history study
Restoration of old forest characteristics in a 1957 spacing trial in the Malcolm Knapp Research Forest, British Columbia
Forest managers are interested in determining how stands that have been logged might be managed to restore features characteristic of forests in later-stages of development. Incorporating forest restoration into forest management enables the use of forest-management skills, such as silviculture and regeneration techniques, to manage individual stands for multiple objectives. Therefore, I performed a comparative analysis of large trees, very-large trees, large snags, very-large snags, and large CWD among three stand types (i.e., 60-yr-managed, 140-yr-natural, and 500-yr-natural stands). The 140-yr-natural and 500-yr-natural stands were used as reference conditions to guide the restoration of a 59-yr-managed spacing trial. All attributes differed among stand-types; however, large snags were the most similar attribute between 140-yr-natural and 500-yr-natural stands. Large trees were the fastest attribute to recover in 60-yr-managed stands, however mean values among stand-types still differed. This study highlights the potential of restoring old-natural attributes in younger-managed stands to increase ecological resiliency., forest, natural, managed, prescription, restoration, old-natural attributes
Restoration of salmonid spawning habitat in the Upper Serpentine River
Over the past half century, urbanization has caused drastic changes to the hydrology and geomorphology of streams and rivers. The Serpentine River is a low-elevation, rain-dominant river located in the City of Surrey, British Columbia. Over the years, urbanization of the watershed, particularly in the upper reaches, has degraded what once was high quality spawning habitat for five salmonid species. The current project is an evaluation of previous restoration efforts at seven study sites and a restoration plan to effectively increase spawning habitat in the Upper Serpentine River. Grain size analysis of the study sites found up to 57% fine sediment in the subsurface particles, attributing to siltation rates of 1.2-1.6 kg/m2/day. Erodible grain sizes at the study sites ranged from 29-164 mm, which mostly exceeded the median size of spawning gravel. These results were verified with a tracer rock study, which together concluded that instream structures were required to reduce tractive forces and increase gravel retention. Newbury weirs, or constructed riffles, were proposed as treatments because their hydraulic characteristics increase flow resistance, promote gravel retention, and create intergravel flows. Newbury weirs involve large diameter rocks spanning across the entire stream, causing accumulation of gravel on the upstream side and pool formation downstream side. Substrate scoured at the pool will be deposited at the tail end of the pool, creating spawning habitat in accelerating and downwelling waters. Bank stabilization using dense live staking with a protective rock toe key was prescribed to reduce further channel incision and siltation. In the longterm, watershed-level priorities including passage through the Serpentine sea dam, monitoring for urban contaminants, and installation of green infrastructure was recommended. The proposed treatments are relatively inexpensive, and if successful, will reduce repeat addition of spawning gravel and increase salmonid production in the Serpentine River. However, the value of the current project extends beyond fish productivity estimates. Monitoring data from restoration works can be used to inform future urban stream restoration projects and contribute to the continual improvement of restoration techniques. The effects of restoration on not only sediment form (ie. gravel depth and size) but also processes (ie. sediment scour and fill) should be investigated in the field to verify theoretical models.
Restoration of the upper Salmon River watershed: projected effects of diversion removal on salmonid abundance
The Salmon River, located within the Laich-kwil-tach First Nations’ traditional territory on Vancouver Island, supports a diverse community of anadromous and resident salmonids despite having cumulative effects from historical resource development (Burt 2010a). Currently, BC Hydro’s diversion dam and transfer canal on the Salmon River provides water for hydroelectric power production in Campbell River, but restricts the upstream and downstream movement of native salmonids (Anderson 2009, BC Hydro 2012). This report addresses removing the Salmon River diversion and providing coho salmon (Oncorhynchus kisutch) and steelhead trout (O. mykiss) unrestricted access into the upper Salmon River watershed. This restoration project will mitigate projected effects of climate change on freshwater life stages of the Salmon River salmonids by addressing increasing stream temperatures and seasonal low flows. Completing this restoration project is the first step in recovering the salmonid productivity of the upper Salmon River., salmonid productivity, Salmon River, coho salmon, steelhead trout, ecological restoration, dam removal
Restoration options for Nicomekl River anadromous salmonids – Elgin Road Bridge Sea Dam
The Nicomekl River flows through historic Katzie First Nation territory in Surrey, British Columbia. The river provides salmon the linkage between their upland spawning and rearing grounds and the Pacific Ocean where they mature. Anthropogenic development has reduced habitat connectivity along the river, denuded the banks of vegetation, removed instream complexity, constrained the channel, regulated flow, and altered the water chemistry. A tidally controlled 7-gate sea dam is the source of the critical connectivity bottleneck on the river. It impairs free longitudinal migrations of adult and juvenile salmonids and increases adult and juvenile predation. Through literature review and site assessment, this study suggests a suite of restoration treatments to restore connectivity and site-based habitat attributes to the Nicomekl River. The study then considers management options in light of climate change, sea level rise, and how to generate public involvement to support the proposed treatments. The study concludes that urban stream restoration faces challenges as it must find a balance between the environmental and social needs of the Nicomekl River beyond simply repairing ecosystem damage and degradation., riparian restoration, salmonids, migration bottlenecks: connectivity

Pages