Master of Science in Ecological Restoration Applied Research Projects | BCIT Institutional Repository

Master of Science in Ecological Restoration Applied Research Projects

Investigating the role of elevated salinity in the recession of a large brackish marsh in the Fraser River estuary
At least 160 ha of the Sturgeon Bank low marsh in the Fraser River delta died off between 1989 and 2011. Humans have heavily modified the Fraser River estuary since the late 1800’s, including installing a series of jetties throughout the leading edge of the delta to train the course of the river. I established a reciprocal transplant experiment to determine the role of elevated salinity in the marsh recession and generate information needed to eventually revegetate areas of receded marsh as part of an intergovernmental collaboration to investigate the causes of this marsh recession. I propose specific actions to better monitor, maintain, and restore the Fraser River delta foreshore brackish marshes in response to ongoing ecological degradation of the estuary. The predicted effects of climate change and sea-level rise may cause us to rethink options for restoring the Sturgeon Bank marsh., Restoration, Fraser River, Schoenoplectus pungens, Reciprocal transplant experiment, Marsh recession, Brackish marsh
Restoration of the upper Salmon River watershed: projected effects of diversion removal on salmonid abundance
The Salmon River, located within the Laich-kwil-tach First Nations’ traditional territory on Vancouver Island, supports a diverse community of anadromous and resident salmonids despite having cumulative effects from historical resource development (Burt 2010a). Currently, BC Hydro’s diversion dam and transfer canal on the Salmon River provides water for hydroelectric power production in Campbell River, but restricts the upstream and downstream movement of native salmonids (Anderson 2009, BC Hydro 2012). This report addresses removing the Salmon River diversion and providing coho salmon (Oncorhynchus kisutch) and steelhead trout (O. mykiss) unrestricted access into the upper Salmon River watershed. This restoration project will mitigate projected effects of climate change on freshwater life stages of the Salmon River salmonids by addressing increasing stream temperatures and seasonal low flows. Completing this restoration project is the first step in recovering the salmonid productivity of the upper Salmon River., salmonid productivity, Salmon River, coho salmon, steelhead trout, ecological restoration, dam removal